The solar park was announced by in January 2012. The first phase of the park was a 13 MWp (DEWA 13) constructed by . It was commissioned on 22 October 2013. It uses 152,880 FS-385 black and generates about 28 per year which corresponds to a of 24.6%. The second phase is a 200 MWp plant built at a cost of US$320 million by a consorti.
Read MoreDownload files
Curtain walls are seen to be an important part of the design of buildings that have high architectural standards. In a nutshell, conventional systems (like brick and mortar) are not able to restrict interior climat.
Read MoreDownload files
24/7 Technical Support
Our certified solar specialists provide round-the-clock monitoring and support for all installed photovoltaic container systems and containerized BESS solutions.